Apartment unit mid-renovation, raw framing transitioning to finished flooring
NY Tri-State & Nationwide

Full Unit Turnarounds.
On Schedule, Every Time.

One contract. One point of contact. Every crew shows up when it's supposed to.

Track Record
0
Units turned.

Same Accountability on every single one.

6 trades. 1 call.

Kitchens, baths, flooring, doors, paint, fixtures — sequenced, not scattered.

NY / NJ / CT — and beyond.

Home turf is the tri-state. The job goes wherever the scope makes sense.

The schedule holds.

Confirmed before day one. No surprises after.

Schedule commitments are confirmed before day one and set by project scope.

Who We Serve

Different Job. Same Contractor.

Owners, property managers, investors, GCs — everyone needs the same thing: a unit done right, on the day it was promised.

Owners & Investors

Your Asset, Protected

One scope, one schedule, and one team responsible for getting the unit ready for what comes next.

For Property Owners
Property Managers

Call Once. Done.

Send the scope once. We coordinate the trades, document the work, and hand the unit back ready for the next step.

For Property Managers
General Contractors

Extra Hands, Zero Hand-Holding

Bring us in for a defined scope or a schedule-sensitive phase. We show up prepared and report through your chain of command.

Work With PPR
Services

Nothing Falls Through.

Every trade sequenced in the right order by the same GC, start to finish — so the punch list is short and the keys come back on the date we gave you.

01Unit Turnarounds

Full Unit Turnarounds

Move-out to move-in without you making a second phone call.

  • Kitchen & bath renovation
  • Flooring installation & refinishing
  • Interior painting
  • Door & hardware replacement
  • Light fixture & electrical finish work
See a Sample Scope
02Common Areas

Common Area Renovations

The spaces every resident walks through daily, brought up to standard on a schedule built around them — staged, dust-controlled, and never blocking a leasing tour.

  • Lobbies & entryways
  • Hallways & corridors
  • Laundry & amenity rooms
  • Consistent finish across the property
Common Area Renovations
The PPR Standard

Same Spec. Every Unit. Every Time.

Consistency is what makes a portfolio predictable. Here's what's non-negotiable on every turn.

Inspection

Every handoff, photographed.

This is how a coordinated crew earns the trust an in-house crew gets for free — we document the work instead of just promising it.

Flooring

Commercial-grade LVP. Thresholds color-matched — not “close enough,” matched.

Paint

Two coats. One palette. Portfolio-wide.

Hardware

Every finish matched, unit to unit.

Cabinets

Documented spec. Never mismatched mid-project.

The PPR Unit Turn Scope Checklist — a one-page document listing every trade and step in a standard turn — is available on request with your quote.

Vacancy Cost Calculator

What's an Empty Unit Costing You Right Now?

Estimate the revenue at risk while a unit sits offline — and what a tighter turnaround could protect.

$2,400

Per-unit market rent.

3units

How many units are offline right now.

21days

Turn length on your current schedule.

9days

Days you'd cut by sequencing every trade under one schedule.

Potential Revenue Protected
$2,160

The rent you stop losing across 3 units when the turn finishes on a locked schedule instead of slipping between separate subcontractors.

Daily Rent
$80
per unit / day
Current Vacancy
$5,040
over 21 days
Discuss Your Turnaround

These figures are an estimate, not a guarantee. Actual turn schedules depend on scope and site conditions, and are confirmed before day one.

Our Work

Proof of Execution

Multifamily and public-housing rehabilitation at scale — properties of hundreds to thousands of units, worked under active-program schedules and inspection standards.

View all 11 projects
Get a Quote

Ready to Turn Your Next Unit on Schedule?

Tell us the scope. We'll tell you the real date.

Get a Free QuoteNo obligation. No pressure. Just a straight answer.